{"id":191829,"date":"2024-08-09T12:48:07","date_gmt":"2024-08-09T10:48:07","guid":{"rendered":"https:\/\/www.rse-web.it\/rapporti\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/"},"modified":"2024-09-19T12:48:04","modified_gmt":"2024-09-19T10:48:04","slug":"results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf","status":"publish","type":"rapporti","link":"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/","title":{"rendered":"Results of the experimentation of network state estimation algorithms through the RSE TF"},"content":{"rendered":"<p class=\"last-updated-date\">Recently updated on September 19th, 2024 at 12:48 pm<\/p>","protected":false},"excerpt":{"rendered":"<p>This paper describes the experimental activities carried out through the RSE Distributed Energy Resources Test Facility with the aim of validating the estimation algorithms developed with a view to increasing the observability of an electricity distribution network. In particular, the algorithms for estimating network impedances, identifying islanded operation, dealing with topological reconstruction, and estimating the network state were checked considering measurements based on the use of Phasor Measurement Units only.<\/p>\n","protected":false},"author":93,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"tags":[1324,1341,1436],"targets":[1317],"rapporti_tipologie":[762],"class_list":["post-191829","rapporti","type-rapporti","status-publish","hentry","tag-electricity-network-en","tag-infrastructure","tag-monitoring","targets-research","rapporti_tipologie-report-en"],"acf":{"projects":{"ID":191050,"post_author":"464","post_date":"2024-07-10 16:51:19","post_date_gmt":"2024-07-10 14:51:19","post_content":"","post_title":"Architecture and management models of the electrical system and grids","post_excerpt":"The project aims to develop methodologies, software tools, prototypes and demonstrators to optimise electric transmission and distribution grids, as well as new architecture and system management models and new regulatory schemes that encourage the integration of renewable and non-programmable generation, self-generation, storage systems and aggregators, and that take into account electric penetration.","post_status":"publish","comment_status":"open","ping_status":"closed","post_password":"","post_name":"architecture-and-management-models-of-the-electrical-system-and-grids","to_ping":"","pinged":"","post_modified":"2024-08-21 12:10:45","post_modified_gmt":"2024-08-21 10:10:45","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rse-web.it\/progetti\/architecture-and-management-models-of-the-electrical-system-and-grids\/","menu_order":0,"post_type":"progetti","post_mime_type":"","comment_count":"0","filter":"raw"},"order_posts":"","dont_show_search":false,"related_posts":false,"dont_show_hompage":false,"show_on_slider":false,"single_post_data":{"titolo_spot":"","post_content":"<p>The research activity described in this paper was aimed at validating through experimental tests the software tools needed to improve the observability of an electrical distribution network using measurements made by Phasor Measurement Unit (PMU). Specifically, methods for estimating grid state, estimating line impedances, identifying grid topology, and recognizing islanded operation were tested through RSE&#8217;s Distributed Energy Resources Test Facility (DER-TF). The purpose of the activity was not only to check the tools developed but also to analyze the actual ability of PMUs to be used to increase network observability.<br \/>\nFrom the results obtained, it is evident that measurements from PMUs alone allow reconstructing the state of the network by solving linear problems, with subsequent low computational cost.<br \/>\nIn addition, the availability of both amplitude and phase measurements makes it possible to recognize islanded operation and identify line impedances.<br \/>\nThe conducted analyses show that model errors result in errors in estimation due to different network layout or errors in cable nameplate data; however, they can be compensated for via PMU-based methods that allow reconstruction of uncertain network parameters. Nevertheless, it is clear that multiple measurements through PMUs are required to accurately estimate the network model; therefore, methods for optimal placement of PMUs should be applied in order to limit infrastructure costs and identify the minimum number of measurement points, considering the constraint of keeping the network observable under all expected operating conditions. Tests have also shown that different placement of PMUs does not affect the estimation results and thus the network state can be reconstructed with a smaller number of measurements and reducing infrastructure costs. It should be noted, however, that a limited number of voltage measurements can lead to high errors in estimation in the case of large measurement uncertainties or problems at a single PMU. For this reason, during the planning phase of the PMUs to be installed in the network, analysis should be done in a simulation environment to check how different measurement uncertainties and different errors may affect the estimator results. The results obtained from the experimentation demonstrated the effectiveness of the developed software tools. In addition, the activity resulted in an integrated infrastructure with the DER-TF that can be used for future developments and improvements of the estimation algorithms.<\/p>\n","link_estreno":false,"scarica_file":[{"download_option":"download","file_name":"Download Report","download":{"ID":173402,"id":173402,"title":"21010603","filename":"21010603.pdf","filesize":6807953,"url":"https:\/\/www.rse-web.it\/wp-content\/uploads\/2022\/11\/21010603.pdf","link":"https:\/\/www.rse-web.it\/en\/rapporti\/risultati-della-sperimentazione-attraverso-la-tf-di-rse-di-algoritmi-di-stima-dello-stato-della-rete\/attachment\/21010603\/","alt":"","author":"93","description":"","caption":"","name":"21010603","status":"inherit","uploaded_to":173401,"date":"2022-11-11 14:06:44","modified":"2022-11-11 14:06:44","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/www.rse-web.it\/wp-includes\/images\/media\/document.png"}}],"button":{"text":"","link":""},"referente_group":false,"data_emissione":"2021-12-31","autori":"R. Lazzari, M.P. Kwaye (RSE S.p.A.)","rapporto":"","rif_rse":"21010603"},"satellite_post_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Results of the experimentation of network state estimation algorithms through the RSE TF - RSE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Results of the experimentation of network state estimation algorithms through the RSE TF - RSE\" \/>\n<meta property=\"og:description\" content=\"This paper describes the experimental activities carried out through the RSE Distributed Energy Resources Test Facility with the aim of validating the estimation algorithms developed with a view to increasing the observability of an electricity distribution network. In particular, the algorithms for estimating network impedances, identifying islanded operation, dealing with topological reconstruction, and estimating the network state were checked considering measurements based on the use of Phasor Measurement Units only.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/\" \/>\n<meta property=\"og:site_name\" content=\"RSE\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-19T10:48:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/\",\"url\":\"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/\",\"name\":\"Results of the experimentation of network state estimation algorithms through the RSE TF - RSE\",\"isPartOf\":{\"@id\":\"https:\/\/www.rse-web.it\/#website\"},\"datePublished\":\"2024-08-09T10:48:07+00:00\",\"dateModified\":\"2024-09-19T10:48:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.rse-web.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Results of the experimentation of network state estimation algorithms through the RSE TF\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.rse-web.it\/#website\",\"url\":\"https:\/\/www.rse-web.it\/\",\"name\":\"RSE\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.rse-web.it\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.rse-web.it\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.rse-web.it\/#organization\",\"name\":\"RSE\",\"url\":\"https:\/\/www.rse-web.it\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rse-web.it\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.rse-web.it\/wp-content\/uploads\/2024\/01\/cropped-logo_rse_2022.png\",\"contentUrl\":\"https:\/\/www.rse-web.it\/wp-content\/uploads\/2024\/01\/cropped-logo_rse_2022.png\",\"width\":734,\"height\":164,\"caption\":\"RSE\"},\"image\":{\"@id\":\"https:\/\/www.rse-web.it\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Results of the experimentation of network state estimation algorithms through the RSE TF - RSE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/","og_locale":"en_US","og_type":"article","og_title":"Results of the experimentation of network state estimation algorithms through the RSE TF - RSE","og_description":"This paper describes the experimental activities carried out through the RSE Distributed Energy Resources Test Facility with the aim of validating the estimation algorithms developed with a view to increasing the observability of an electricity distribution network. In particular, the algorithms for estimating network impedances, identifying islanded operation, dealing with topological reconstruction, and estimating the network state were checked considering measurements based on the use of Phasor Measurement Units only.","og_url":"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/","og_site_name":"RSE","article_modified_time":"2024-09-19T10:48:04+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/","url":"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/","name":"Results of the experimentation of network state estimation algorithms through the RSE TF - RSE","isPartOf":{"@id":"https:\/\/www.rse-web.it\/#website"},"datePublished":"2024-08-09T10:48:07+00:00","dateModified":"2024-09-19T10:48:04+00:00","breadcrumb":{"@id":"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.rse-web.it\/en\/reports\/results-of-the-experimentation-of-network-state-estimation-algorithms-through-the-rse-tf\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.rse-web.it\/en\/"},{"@type":"ListItem","position":2,"name":"Results of the experimentation of network state estimation algorithms through the RSE TF"}]},{"@type":"WebSite","@id":"https:\/\/www.rse-web.it\/#website","url":"https:\/\/www.rse-web.it\/","name":"RSE","description":"","publisher":{"@id":"https:\/\/www.rse-web.it\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rse-web.it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.rse-web.it\/#organization","name":"RSE","url":"https:\/\/www.rse-web.it\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rse-web.it\/#\/schema\/logo\/image\/","url":"https:\/\/www.rse-web.it\/wp-content\/uploads\/2024\/01\/cropped-logo_rse_2022.png","contentUrl":"https:\/\/www.rse-web.it\/wp-content\/uploads\/2024\/01\/cropped-logo_rse_2022.png","width":734,"height":164,"caption":"RSE"},"image":{"@id":"https:\/\/www.rse-web.it\/#\/schema\/logo\/image\/"}}]}},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.rse-web.it\/en\/wp-json\/wp\/v2\/rapporti\/191829","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rse-web.it\/en\/wp-json\/wp\/v2\/rapporti"}],"about":[{"href":"https:\/\/www.rse-web.it\/en\/wp-json\/wp\/v2\/types\/rapporti"}],"author":[{"embeddable":true,"href":"https:\/\/www.rse-web.it\/en\/wp-json\/wp\/v2\/users\/93"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rse-web.it\/en\/wp-json\/wp\/v2\/comments?post=191829"}],"version-history":[{"count":2,"href":"https:\/\/www.rse-web.it\/en\/wp-json\/wp\/v2\/rapporti\/191829\/revisions"}],"predecessor-version":[{"id":196816,"href":"https:\/\/www.rse-web.it\/en\/wp-json\/wp\/v2\/rapporti\/191829\/revisions\/196816"}],"wp:attachment":[{"href":"https:\/\/www.rse-web.it\/en\/wp-json\/wp\/v2\/media?parent=191829"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rse-web.it\/en\/wp-json\/wp\/v2\/tags?post=191829"},{"taxonomy":"targets","embeddable":true,"href":"https:\/\/www.rse-web.it\/en\/wp-json\/wp\/v2\/targets?post=191829"},{"taxonomy":"rapporti_tipologie","embeddable":true,"href":"https:\/\/www.rse-web.it\/en\/wp-json\/wp\/v2\/rapporti_tipologie?post=191829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}