Search in the site by keyword

projects - Power System Research - Three year plan (2006-2008)

Power plants for co-production of electricity and hydrogen

projects - Power System Research - Three year plan (2006-2008)

Power plants for co-production of electricity and hydrogen

Verifying the feasibility of the solution that, through coal gasification and the separation of CO2 from synthesis gas, allows for the flexible production of electricity and hydrogen from a technical, economic and authorization perspective, with the aim of paving the way for the first significant implementation

Verifying the feasibility of the solution that, through coal gasification and the separation of CO2 from synthesis gas, allows for the flexible production of electricity and hydrogen from a technical, economic and authorization perspective, with the aim of paving the way for the first significant implementation