Search in the site by keyword

projects - Power System Research - Three year plan (2000-2002)

Robotic inspection and monitoring systems

projects - Power System Research - Three year plan (2000-2002)

Robotic inspection and monitoring systems

Study and implementation of remotely controlled equipment and systems aimed at monitoring or inspection of critical plant components and areas with limited, challenging, or difficult accessibility during operation or maintenance.

Study and implementation of remotely controlled equipment and systems aimed at monitoring or inspection of critical plant components and areas with limited, challenging, or difficult accessibility during operation or maintenance.