Search in the site by keyword

projects - Power System Research - Three year plan (2003-2005)

Development of legislation for system aspects of electricity supply

projects - Power System Research - Three year plan (2003-2005)

Development of legislation for system aspects of electricity supply

  • Contribute to regulatory compliance for system aspects of electricity supply, in particular with regard to the operation of electricity grids and the criteria for connection to the grids themselves (TC 8 IEC and TC 8X CENELEC) and the characterization of the quality of electrical voltage (IEC 77A);
  • Contribute to the regulations on the operation of electricity grids and connection criteria (TC 82 IEC), including the connection of photovoltaic systems to the grid.
    • Contribute to regulatory compliance for system aspects of electricity supply, in particular with regard to the operation of electricity grids and the criteria for connection to the grids themselves (TC 8 IEC and TC 8X CENELEC) and the characterization of the quality of electrical voltage (IEC 77A);
    • Contribute to the regulations on the operation of electricity grids and connection criteria (TC 82 IEC), including the connection of photovoltaic systems to the grid.