Search in the site by keyword

projects - Power System Research - Three year plan (2000-2002)

Influence of problems associated with electric and magnetic fields

projects - Power System Research - Three year plan (2000-2002)

Influence of problems associated with electric and magnetic fields

Construction of the descriptive framework of the exogenous variables and their influence on the possible buffer zones for power lines. Development of a methodology to evaluate the intersection of the electricity grid with the territory by building the knowledge base from a sample case.

Construction of the descriptive framework of the exogenous variables and their influence on the possible buffer zones for power lines. Development of a methodology to evaluate the intersection of the electricity grid with the territory by building the knowledge base from a sample case.