Search in the site by keyword

projects - Power System Research - Three year plan (2003-2005)

Innovative oversight and control systems for active LV grids

projects - Power System Research - Three year plan (2003-2005)

Innovative oversight and control systems for active LV grids

Model low-voltage grids with a high presence of distributed resources; study and test power line and wireless communication systems; and develop a monitoring and control system for active low-voltage grids to be integrated into the CESI test facility.

Model low-voltage grids with a high presence of distributed resources; study and test power line and wireless communication systems; and develop a monitoring and control system for active low-voltage grids to be integrated into the CESI test facility.