Search in the site by keyword

projects - Power System Research - Three year plan (2000-2002)

Process of wastewater treatment and reintegration of thermoelectric plants

projects - Power System Research - Three year plan (2000-2002)

Process of wastewater treatment and reintegration of thermoelectric plants

Develop configurations, processes and treatments related to the water system of generation plants with the aim of reducing the withdrawal of process water from water bodies, reducing generation costs and minimizing the discharge of polluting waste into the environment.

Develop configurations, processes and treatments related to the water system of generation plants with the aim of reducing the withdrawal of process water from water bodies, reducing generation costs and minimizing the discharge of polluting waste into the environment.