Search in the site by keyword

projects - Power System Research - Three year plan (2006-2008)

Safety of Italian hydroelectric basins and optimal use of water resources

projects - Power System Research - Three year plan (2006-2008)

Safety of Italian hydroelectric basins and optimal use of water resources

The activities are the logical continuation and completion of P7 (2007). In particular, the SW prototypes for structural and hydraulic simulation and the use of GIS and computer systems to support mini-hydro design and production will be applied.