Search in the site by keyword

projects - Power System Research - Three year plan (2006-2008)

Development of the transmission system

The project continues part of the work carried out in WP 1.1 (2006). The objective of the activity is to create an integrated environment for long-term planning of transmission grids.

The project continues part of the work carried out in WP 1.1 (2006). The objective of the activity is to create an integrated environment for long-term planning of transmission grids.