Search in the site by keyword

projects - Power System Research - Three year plan (2000-2002)

Ultra-grinding for the treatment of hazardous waste from thermoelectric production

projects - Power System Research - Three year plan (2000-2002)

Ultra-grinding for the treatment of hazardous waste from thermoelectric production

Verify the applicability of ultra-grinding treatment for the inertization of solid waste and the treatment of contaminated soil.

Verify the applicability of ultra-grinding treatment for the inertization of solid waste and the treatment of contaminated soil.