This report provides a summary of the work carried out by the Italian team, led by RSE, in the FlexPlan project during the year 2022.
This work mainly consisted of three lines of activity: the elaboration of the Italian regional case, the elaboration and implementation of the algorithm involving the decomposition of the transmission planning problem from that of distribution networks, and the creation of an open-source library that applies the planning methodology proposed by FlexPlan.

This report provides a summary of the work carried out by the Italian team, led by RSE, in the FlexPlan project during the year 2022.

 

This work mainly consisted of three lines of activity:

 

  • elaboration of the Italian regional case: completion of the database and development of the simulations for the three decades 2030, 2040 and 2050;
  • elaboration and implementation of the algorithm which provides for the decoupling of the transmission planning problem from the one of the distribution networks. This led to the formulation of a “coordinated” planning methodology which is also proposed as a possible operational methodology for the actual interaction between transmission and distribution operators;
  • creation of an open-source library which applies the planning methodology proposed by FlexPlan. This library replicates the main functions performed by the toolbox created by the project partner N-SIDE, except for the part of the pre-processor and the graphical interface. Due to its open-source nature, this library lends itself to being used for research and development studies.