System Luciano Martini*, Carlo Ismaele Tornelli*, Claudio Luciano Bossi*, Enrico Tironi** Gabrio Superti Furga** CIRED 2009 20th International Conference and Exhibition on ELECTRICITY DISTRIBUTION Praga, 8-11 Giugno 2009 * ERSE SpA (EX CESI RICERCA) ** POLITECNICO DI MILANO In this paper we report on design, assembly, commissioning and testing of a LV DC test facility, developed in the framework of national R&D project, designed to be operated both connected and isolated from the AC CESI results of developed front-end control strategy are reported and discussed: a voltage DC bus dynamic error lower than 2% is obtained even for severe and sudden load changes.